Let our experience work for you.

We are passionate about our work and our aim is to develop lasting partnerships by adding expertise and value to projects.

RECENT PROJECTS

Project: Completed Strip Out and Decommissioning of three manufacturing modules at Boston Scientific, Galway

Developer: PM Group

Area: 30,000m2

Project Status: Complete

UMR Group Role:
Strip out of production floor – removal of mezzanine floor, office/canteen, strip out of all utilities, services, boiler rooms and electrical room. Plinths and bunds removed and returned to sub-floor level. All internal walls, ceiling, hangars, light fittings, ducting, cabling, ceiling voids, handrails and raised floor area removed. Externally carried out the removal of redundant AHU ‘s redundant cabling and ducting from roof and all existing storage area, gates, fencing and walk ways removed.

Project: Irish Rail, Pearse St Station, Dublin – Major roof removal

Main Contractor: John Sisk & Son

Overall Project Value: €17 million

Project Status: Complete

UMR Group Role:
The roof comprised of forty barrelled roof trusses over thirty-eight bays, with additional gable end structure at both ends. The span of the roof trusses is approximately 28m, with bays spaced at approximately 4.25m centre to centre. The trusses were longitudinally linked by timber purlins along the length of the running shed. The trusses were laterally braced with ties and struts. UMR provided the specialist services of our oxy-propane thermal dismantling crew to assist in the removal of these trusses. All redundant metal resulting from this aspect of project were removed, processed and recycled at our Licensed Waste Facility. The team did a fantastic job completing this projects over a number of months including weekends.

View More Info:
facebook.com/iarnrodeireann
irishrail.ie

Project: Redevelopment of the former Central Bank Building, Dame Street, Dublin

Developer: Hines and Peterson Group

Project Value: €75 million

Current Status: Ongoing

UMR Group Role:
Played a key role in the internal strip out and disassembly works across the Central Plaza Development alongside this we also provided metals recycling services to the site. UMR Group played a crucial role in the delicate roof removal phase of the project. This required the removal of the existing pitched copper clad roof and the removal of the original 1970’s flat roof while ensuring the Macalloy structure was protected. The team carried out structural protection works, fireproofing, asbestos removal works and the renovation of the Macalloy castings in the tower building. UMR also carried out the gutter lining and stone reinstatement works during this phase of the project. The new development will see the rooftop make way for a new 360 degree 300 seater all glass rooftop restaurant and bar – which will be the crowning glory on this city centre icon. We are delighted to be a part of what will be a stunning redevelopment.

Current Project: PSCS on Player Wills & Bailey Gibson Site , Dublin 8

Developer: Hines

Project Management: Virtus

Current Status: Ongoing

UMR Group Role:
PSCS (Project Supervisor Construction Stage). Works consist of the remediation of all asbestos containing material, strip out of mechanical and electrical plant and equipment and will include the  demolition of various buildings and warehouses across two separate and distinct sites covering a total area 4.5 hectares. The package included enabling and investigation works , remediation and other temporary works. UMR provide waste management services for the site and of course all metals are recycled at our licenced waste facility.

Current Project: PSCS on Former Portobello College Demolition

Client: Jurys Hotels

Current Status: Ongoing

UMR Group Role:
UMR Group to have completed a full internal strip-out of the former college on the Grand Canal Locke and have commenced hard demolition and the site will be cleared to make way for a new Jurys NYX hotel.

Current Project: Redevelopment of Two Grand Parade, Dublin 6

Main Contractor: John Sisk & Son

Project Management: Virtus

Current Status: Ongoing

UMR Group Role:
Originally constructed in 1962, the property is the former headquarters of JP Carroll’s Cigarette Company and is one of Dublin’s most iconic buildings. UMR Group will be carrying out the complete strip out across all 8 floors and 49,815-square-foot of the existing office building to make way for the refurbishment . UMR will carry out the hard demolition of numerous redundant warehouses at rear of site utilising our high reach machine  making way for a new extension. UMR  to carry out the removal of all ACM’s, M&E, ducting, flooring, windows, walls, handrails, ceiling, partitions and all offices/ kitchens and AHU’s etc. Two Grand Parade has been designed as a LEED gold building and we will be actively complying with all LEED requirements while carrying out the works. All materials capable of reuse will be diverted into recycling streams.

OLDER PROJECTS

Project: Strip out of the Dell EMF 3 (Production Warehouse) Plant in Raheen, Business Park, Limerick.

Project Manager: PM Group

Our Role:
The project involved the complete internal strip out of a 30,000sqm production area which included approximately 2,000 tonnes of metal, the bulk of which contained: redundant mechanical equipment, mechanical services, electrical services, structural platforms and redundant rooms. Some of the internal strip out work was carried out in the close vicinity of existing live mechanical and electrical services which needed to be maintained throughout the demolition schedule. Metal arising during the internal strip out was as much as practicably possible segregated at the Dell facility prior to being transported & removed to our facility in Limerick. Personnel separated the material into ferrous & non-ferrous and further so into each specific grade. Any items deemed too big or oversized for shipping were processed further to allow for its safe loading & transport.

“Aggressive six -week schedule for the completion of the works- the demolition works were completed within the time scale requested in a highly satisfactory manner” – PM Group

Project: Lisheen Mine Closure – Demolition & Equipment Recovery

Project Management: C3 Projects/ Hunterdale & The Lisheen Mine working for Verdanta

Our Role:

Complete dismantling, processing & removal of Lisheen Mine buildings stuctures and equipment to allow for the former mine site remediation. The dismantling, processing & removal of mine buildings & equipment including the main mine building, offices & laboratory, storage tanks & silos. Items processed – Large 60m high, raw material storage structure known as the ‘Teepee’ & its conveyors, main building & offices completely dismantled to ground level – interior structures and tanks processed and removed.              Zinc/lead thickener tanks, lime silos, backfill storage building & tanks. Items to be retained (ball mill & verti-mill) were left in situ and these were worked around and protected during all dismantling works. Over 5,500 tonnes of metals removed & recycled.

GET IN TOUCH

To talk about your project or get a quote,
just call us on 061 603848 or Email us

CONTACT US

Back to Top